Please use this identifier to cite or link to this item: http://repositorio.unitau.br/jspui/handle/20.500.11874/2119
Full metadata record
DC FieldValueLanguage
dc.contributor.authorGarcia P.L.C.pt_BR
dc.contributor.authorDe Barros J.G.M.pt_BR
dc.contributor.authorPanhoca L.pt_BR
dc.date.accessioned2019-09-12T16:32:53Z-
dc.date.available2019-09-12T16:32:53Z-
dc.date.issued2007-
dc.citation.volume3pt_BR
dc.citation.issue3pt_BR
dc.citation.spage87-
dc.citation.epage112-
dc.identifier.issn1809239X-
dc.identifier.urihttps://www.scopus.com/inward/record.uri?eid=2-s2.0-37849007115&partnerID=40&md5=9d74d12b03fbbfdc877ac838c6fd81fe-
dc.identifier.urihttp://repositorio.unitau.br/jspui/handle/20.500.11874/2119-
dc.description.abstractThe continuous search to improve productivity leads organizations to rationalize and manage better their available resources. The benefits are huge and recognized. But, each organizational component must be engaged to reach better productivity levels, helping the whole organization result. And within this context, the present study was developed. It concerns about the results analysis of a productivity improvement program implemented in a physical and chemical analysis lab of a petroleum refinery, located in São Paulo state. Three aspects were analyzed: management adjust of lab labor, costs minimization and client service improvement. The methodology of this program was based on PDCA Cycle and also on Productivity Cycle. Five productivity measures were used to follow the program analysis, with two physical indexes, related to labor, and three monetary indexes, related to labor, materials, and service. It was used a production measure as well, the standard time applied in assays, focused in the client service. These indexes were calculated monthly, before and after the productivity program start. Than, the results of these two periods were compared and analyzed. The conclusion was that the introduction of the productivity program reached partially the expected goals, bringing positive results as the better profitability of laboratory labor and the better attendance for laboratory clients. Related to costs, the benefit of interrupting the labor costs increase tendency was obtained, but it is still necessary to continue with this program, in order to pursue better results.en
dc.description.provenanceMade available in DSpace on 2019-09-12T16:32:53Z (GMT). No. of bitstreams: 0 Previous issue date: 2007en
dc.languagePortuguêspt_BR
dc.relation.ispartofRevista Brasileira de Gestao e Desenvolvimento Regional-
dc.rightsAcesso Restritopt_BR
dc.sourceScopuspt_BR
dc.subject.otherAnalytical laboratoryen
dc.subject.otherEvaluation indexesen
dc.subject.otherPetroleum refineryen
dc.subject.otherProductivityen
dc.titleImplantation of a productivity improvement program [Implantação de um programa de melhoria da produtividade]en
dc.typeArtigo de Periódicopt_BR
dc.description.affiliationGarcia, P.L.C., Gestão e Desenvolvimento Regional pela Universidade de Taubaté, Gerente de Laboratório - Refinaria de Petróleo da PETROBRAS-
dc.description.affiliationDe Barros, J.G.M., Engenharia de Produção pela Universidade Federal do Rio de Janeiro, Universidade do Estado do Rio de Janeiro, Universidade de Taubaté-
dc.description.affiliationPanhoca, L., Contabilidade pela Universidade de São Paulo, Programa de Mestrado, Gestão e Desenvolvimento Regional da Universidade de Taubaté, Sócio e Diretor Técnico da Panhoca Consultoria e Pesquisas Ltda.-
dc.identifier.scopus2-s2.0-37849007115-
dc.contributor.scopus51461362600pt_BR
dc.contributor.scopus23134351300pt_BR
dc.contributor.scopus21743479800pt_BR
Appears in Collections:Artigos de Periódicos

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.