Please use this identifier to cite or link to this item: http://repositorio.unitau.br/jspui/handle/20.500.11874/2177
Full metadata record
DC FieldValueLanguage
dc.contributor.authorBorges Jr., Cyro Alvespt_BR
dc.contributor.authorTavares, Maria Elizabeth da Nóbregapt_BR
dc.contributor.authorAzevedo, Vanessa da Silva dept_BR
dc.contributor.authorBarros, José Glenio Medeiros dept_BR
dc.date.accessioned2019-09-12T16:32:59Z-
dc.date.available2019-09-12T16:32:59Z-
dc.date.issued2008-
dc.citation.volume4pt_BR
dc.citation.issue2pt_BR
dc.citation.spage23-
dc.citation.epage40-
dc.identifier.issn1809239X-
dc.identifier.urihttps://www.scopus.com/inward/record.uri?eid=2-s2.0-49449090920&partnerID=40&md5=498561110e0f387bf8e72bbc5945a029-
dc.identifier.urihttp://repositorio.unitau.br/jspui/handle/20.500.11874/2177-
dc.description.abstractThis work proposes a model of process organization construction of a commercial building, chaining the logistics of provisioning of the site with the assembly of the metallic structures. In order to emphasize critical problems of process and to identify their solutions, it was studied a logistic proposal for the supply of the structures in a located work Downtown of Rio de Janeiro. The synchronization between the logistics activity with the structures assembly process follows the lean logic of wait time reduction, the elimination of stocks in construction site and the creation of simultaneous fronts, as condition for the improvement of productivity of the whole work. It is analyzed the value stream mapping of the materials flow and operations understood between the structures warehouse and the construction site, verifying the swinging o f production activities and the possible productivity gains.en
dc.description.provenanceMade available in DSpace on 2019-09-12T16:32:59Z (GMT). No. of bitstreams: 0 Previous issue date: 2008en
dc.languagePortuguêspt_BR
dc.relation.ispartofRevista Brasileira de Gestao e Desenvolvimento Regional-
dc.rightsAcesso Restritopt_BR
dc.sourceScopuspt_BR
dc.subject.otherBuilding constructionen
dc.subject.otherLean constructionen
dc.subject.otherSteel structuresen
dc.titleIncrease of the productivity in lean construction analyzed by the value stream mapping of the material flow in the assembly of steel structures [Aumento da produtividade na construção Lean predial analisada pelo mapeamento de cadeia de valor na montagem das estruturas metálicas]en
dc.typeArtigo de Periódicopt_BR
dc.description.affiliationBorges Jr., C.A., Depto. de Engenharia Mecânica, Faculdade de Engenharia, Universidade do Estado do Rio de Janeiro, Universidade do Estado do Rio de Janeiro, Departamento de Engenharia Mecânica, São Francisco Xavier, 524, bloco A, Maracanã 20550-013 - Rio de Janeiro, RJ, Brazil-
dc.description.affiliationTavares, M.E.D.N., Depto. de Estruturas, Faculdade de Engenharia, Universidade do Estado do Rio de Janeiro-
dc.description.affiliationDe Azevedo, V.D.S., Programa de Mestrado em Engenharia Civil, Universidade do Estado do Rio de Janeiro-
dc.description.affiliationDe Barros, J.G.M., Gestão e Desenvolvimento Regional, Universidade de Taubaté-
dc.identifier.scopus2-s2.0-49449090920-
dc.contributor.scopus7005937028pt_BR
dc.contributor.scopus24554487800pt_BR
dc.contributor.scopus24553787200pt_BR
dc.contributor.scopus23134351300pt_BR
Appears in Collections:Artigos de Periódicos

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.